NARI Award-Winning Design-Build★★★★★ 4.8 on Google & Houzz
(262) 735-7572 New Berlin, WI
Advantage Design + Remodel ADR
Home/Portfolio/Oak Creek Kitchen Remodel
Finished Oak Creek kitchen remodel with cream cabinetry and arched details
Project Case Study · Oak Creek, WI

Oak Creek, Wisconsin Kitchen Remodel

One kitchen,
start to finish.

A complete first-floor kitchen transformation: custom cabinetry, quartz surfaces, a statement range wall, and an arched coffee bar. Here is exactly how the project ran, phase by phase.

★★★★★4.8 rated by homeowners on Google & Houzz
Project at a Glance
Real numbers, published openly
Initial Contracted Total$118,500
Change Orders$2,140
Final Investment$120,640
Construction Timeline10 Weeks
Design to Completion6 Months

Sample figures shown for layout. Final page will publish this project's actual contracted totals, the same way we quote: fixed price, no surprises.

See The Transformation

The finished space

Arched coffee bar niche with navy wallpaper and beverage fridge
Arched Coffee Bar
Wide view of the finished kitchen
Main Kitchen
Statement range wall with custom hood
Range Wall
Island with quartz countertop
Island & Storage
Dining area beside the new kitchen
Dining Area
Key Features

What this project included

Custom Cabinetry Quartz Countertops Statement Range Wall Custom Hood Surround Arched Coffee Bar Beverage Center Open Shelving New Lighting Plan Hardwood Flooring
Challenges & Solutions

Where experience earned its keep

Every remodel meets the unexpected. What matters is how it gets handled, and whether you hear about it before it costs you.

Challenge

The homeowners wanted a built-in coffee and beverage bar, but the only available wall sat in a walkway between the kitchen and dining area, where a standard cabinet run would have pinched traffic flow.

Solution

We designed a recessed arched niche instead: full-depth storage set into the wall, wrapped in a feature backsplash, with lighted shelving and an undercounter beverage fridge. Zero inches lost from the walkway.

Challenge

The original layout put the range on an outside wall with a window directly above it, making a proper vent hood impossible without losing natural light.

Solution

The cooking wall moved to an interior wall with a custom hood surround as the room's centerpiece, and the window stayed, now lighting the new prep counter instead.

Project Phases

How the build actually ran

Once design, selections, and the fixed-price contract were locked, construction followed a planned sequence with updates at every milestone.

01

Demolition & Rough-In

Existing kitchen removed with full containment and floor protection. Framing for the new range wall and arch, plus rough electrical and plumbing.

02

Drywall & Flooring

Walls closed and finished, hardwood flooring installed and protected for the remainder of the build.

03

Cabinetry Installation

Custom cabinetry set, leveled, and aligned, including the coffee bar built-ins and hood surround.

04

Countertop Template & Install

Quartz templated after cabinet completion for exact fits, then fabricated and installed.

05

Tile, Fixtures & Hardware

Backsplash tile, plumbing fixtures, lighting, and hardware installed and connected.

06

Trim, Paint & Final Walkthrough

Trim installed, ceilings and walls painted, the site thoroughly cleaned, and a final walkthrough performed with the homeowners.

Materials & Selections

What went into it

Every selection was made in our New Berlin showroom before construction started, so ordering was locked before demolition began.

Kitchen

CabinetryCustom painted cabinetry, full overlay, soft-close throughout
CountertopsQuartz, perimeter and island
Range WallCustom hood surround with feature tile to the ceiling
LightingLayered plan: recessed general, island pendants, under-cabinet task
FlooringHardwood, continuous into the dining area

Coffee Bar

Built-InsRecessed arched niche with lighted shelving, fabricated by our team
Feature WallPatterned backsplash wrapping the full arch
AppliancesUndercounter beverage fridge and coffee station

Selections listed generically here; the final page will name each manufacturer and line the same way we spec them in your proposal.

After The Dust Settled

Final review, months later

A few months after completion we scheduled a return visit: a final review to address anything the homeowners had discovered living in the space, plus the completion photos you see on this page. That visit, and the two-year workmanship warranty behind it, is part of every Advantage project.

Completed Oak Creek kitchen
Get Started

Want your project to run like this?

Fixed-price contract, 3D design before construction, and a team that publishes how its projects actually go. Book your free design consultation.

Call Now Book Consultation